[Case Study - 02] Construction Material Manufacturing
Introducing a case aimed at improving production downtime through setup for small-lot production of multiple varieties!
We would like to introduce a case study of problem-solving using our "APS Chuck and APS Quick Jaws." To reduce setup time, we adopted "parent-child jaws," but there were issues such as the time-consuming adjustments for centering due to unstable reproducibility. Therefore, we introduced APS 8-inch chucks (3 units) and APS raw jaws (200 sets). Now, setup work can be done by anyone, and once formed, the reproducibility is high, which has reduced the wear on the jaws. 【Overview】 ■Issues - Setup was limited to specific individuals. - We felt there were limits to reducing setup time with parent-child jaws. ■Solution - Introduced APS 8-inch chucks (3 units) and APS raw jaws (200 sets). *For more details, please refer to the PDF document or feel free to contact us.